Skip to content

Recent Posts

  • SERPs in 2023: Eliza Hutton’s Impact on the Industry
  • Exploring the Height of Dan and Shay: A Comprehensive Analysis
  • Unlocking the Enigma of Tiffani Beaston’s Net Worth
  • How Tall is Fortune Feimster? Unveiling the Truth
  • Yahweh Ben Yahweh Net Worth: Unveiling the Financial Legacy

Most Used Categories

  • Uncategorized (2,913)
  • Business (1,609)
  • Technology (255)
  • Health (224)
  • News (106)
  • Fashion (84)
  • Article (73)
  • Education (73)
  • Digital Marketing (54)
  • Food (53)
Skip to content

Subscribe
  • Bitcoin
  • Business
  • Fashion
  • Food
  • Health
  • News
  • Software
  • sports
  • Technology
  • Contact US
    • FAQ
      • Pin Posts
  • Privacy Policy
  • Home
  • Uncategorized
  • Data Center Construction Market Report 2022-27, Industry Trends, Share, Size, Demand and Future Scope

Data Center Construction Market Report 2022-27, Industry Trends, Share, Size, Demand and Future Scope

adminApril 8, 2022

According to IMARC Group’s latest report, titled “Data Center Construction Market: Industry Share, Size, Growth, Opportunity and Forecast 2022-2027,” the global data center construction market reached a value of US$ 47.2 Billion in 2021. Looking forward, IMARC Group expects the market to reach US$ 75.3 Billion by 2027, exhibiting at a CAGR of 9% during 2022-2027.

Report Metric
Historical: 2016-2021
Base Year: 2021
Forecast Year: 2022-2027

We are regularly tracking the direct effect of COVID-19 on the market, along with the indirect influence of associated industries. These observations will be integrated into the report.

Data center construction refers to the process of physically designing and building a data center facility with the required capacity, efficient design and disaster tolerance systems to perform essential functions. It generally consists of backup power supplies, data communication connections, air conditioning (AC), fire suppression systems, and security devices. It assists in the optimal utilization of resources and ensures that environmental factors are taken into consideration.

Request Free Sample Report: https://www.imarcgroup.com/data-center-construction-market/requestsample

Market Trends

Significant growth in the information technology (IT) industry, along with the continuous rise in data consumption and widespread utilization of big data analytics and cloud-based system, represents one of the major factors driving the market. Apart from this, the construction of green data centers is gaining traction across the globe as these data centers use low emission building materials that facilitate efficient waste recycling. Moreover, extensive infrastructural developments, in confluence with the launch of liquid cooling technology and direct-to-cooling chip server racks to prevent overheating in data centers, are anticipated to strengthen the market growth.

Ask Analyst and Browse Full Report with TOC & List of Figure: https://www.imarcgroup.com/data-center-construction-market

List of Key Companies Covered in this Market Report:

  • AECOM (NYSE: ACM)
  • DPR construction Inc.
  • Eaton Corporation Inc. (NYSE: ETN)
  • Fujitsu Limited (TYO: 6702)
  • Holder Construction Company
  • Legrand SA (EPA: LR)
  • Rittal GmbH & Co. KG
  • Schneider Electric SE (EPA: SU)
  • Tripp Lite
  • Turner Construction
  • Vertiv Group Corporation. (NYSE: VRT)

The report has segmented the market on the basis of construction type, data center type, tier standard, vertical and geography.

Breakup by Construction Type:

  • Electrical Construction
    • UPS
    • Rack PDU (Power Distribution Unit)
    • Generators
    • Transfer Switches and Switchgears
    • Others
  • Mechanical Construction
    • Cooling Systems
    • Racks
    • Others

Breakup by Data Center Type:

  • Mid-Size Data Centers
  • Enterprise Data Centers
  • Large Data Centers

Breakup by Tier Standards:

  • Tier I & II
  • Tier III
  • Tier IV

Breakup by Vertical:

  • Public Sector
  • Oil & Energy
  • Media & Entertainment
  • IT & Telecommunication
  • Banking, Financial Services and Insurance (BFSI)
  • Healthcare
  • Retail
  • Others

Breakup by Geography:

  • North America (U.S. & Canada)
  • Europe (Germany, United Kingdom, France, Italy, Spain, Russia, and Others)
  • Asia Pacific (China, India, Japan, South Korea, Indonesia, Australia, and Others)
  • Latin America (Brazil, Mexico)
  • Middle East & Africa

Key highlights of the report:

  • Market Performance (2016-2021)
  • Market Outlook (2022- 2027)
  • Porter’s Five Forces Analysis
  • Market Drivers and Success Factors
  • SWOT Analysis
  • Value Chain
  • Comprehensive Mapping of the Competitive Landscape

If you need specific information that is not currently within the scope of the report, we can provide it to you as a part of the customization.

About Us

IMARC Group is a leading market research company that offers management strategy and market research worldwide. We partner with clients in all sectors and regions to identify their highest-value opportunities, address their most critical challenges, and transform their businesses.

IMARC’s information products include major market, scientific, economic and technological developments for business leaders in pharmaceutical, industrial, and high technology organizations. Market forecasts and industry analysis for biotechnology, advanced materials, pharmaceuticals, food and beverage, travel and tourism, nanotechnology and novel processing methods are at the top of the company’s expertise.

Contact US:

IMARC Group
30 N Gould St, Ste R
Sheridan, WY 82801, USA
Email: sales@imarcgroup.com
Americas: +1-631-791-1145 | Europe & Africa: +44-753-713-2163 | Asia: +91-120-433-0800

Data Center Construction Market

Post navigation

Previous: What We Love About the XT-22 Rock Island 1911 Pistol
Next: Hemostats Market 2022-27: Global Size, Share, Growth, Trends and Forecast

Related Posts

Introducing Amazon’s GPT-55X: Your AI Assistant of the Future

September 14, 2023September 14, 2023 Hamza Sarwer

Best travel places to visit in Virginia

July 31, 2023July 31, 2023 admin
What is the Importance of Patient Satisfaction in Healthcare?

What is the Importance of Patient Satisfaction in Healthcare?

April 10, 2023April 13, 2023 Aown Kazmi

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • SERPs in 2023: Eliza Hutton’s Impact on the Industry
  • Exploring the Height of Dan and Shay: A Comprehensive Analysis
  • Unlocking the Enigma of Tiffani Beaston’s Net Worth
  • How Tall is Fortune Feimster? Unveiling the Truth
  • Yahweh Ben Yahweh Net Worth: Unveiling the Financial Legacy

Categories

  • APPs
  • Article
  • Auto
  • Bitcoin
  • Business
  • Digital Marketing
  • Education
  • Entertainment
  • Fashion
  • financial
  • Food
  • Health
  • Home
  • Information
  • News
  • Social Media
  • Software
  • sports
  • Technology
  • Trading
  • Uncategorized
Copyright All Rights Reserved | Theme: BlockWP by Candid Themes.